• Main Office: 01442 216785 | email: Info@mtshealth.co.uk
    Harlow Service Centre: 01279 976017

MTS Advises Aecon and Trust on Oriel Project

MTS Advises Aecon and Trust on Oriel Project

Role  Equipment Advisor – OBC

MTS worked alongside Aecom to develop the type and quantity of equipment based on the Schedule of Accommodation and Drawings; for both the Hospital element and the UCL IoO.

MTS provided costings for all new and worked with the Trust to establish a Business as Usual cost for replacing equipment in readiness for the potential transfer assumptions. The OBC was written up and a full recommendation report going into FBC was presented. This included a walk around assessment of both sites for estimated transfer assumptions.

MTS has worked with the Trust Clinical Engineering; Project Team, Architects and other cost advisors to create the Equipment input into the OBC: Budgets have been given for:

  • All New
  • Transfer assumptions
  • Life Cycle
  • Costs