MTS Trust Advisors MTS has been re-appointed to assist the Oriel team in the preparation of signed equipment room lists and budgets; working collaboratively with the Oriel contractor Bouygues and their design team.
Moorfields Eye Hospital Foundation NHS Trust – Oriel Project - MTS Equipment Advisor
MTS previously provided costings for all new equipment and worked with the Trust to establish a Business as Usual cost for replacing equipment in readiness for the potential transfer assumptions. The OBC was written up and a full recommendation report for FBC was prepared. This included a walk around assessment of both sites for estimated transfer assumptions. MTS has worked with the Trust Clinical Engineering; Project Team, Architects and closely with UCL and other cost advisors to create the Equipment input.
![image alt text](/_next/image?url=https%3A%2F%2Fcdn.sanity.io%2Fimages%2Fncnlaurs%2Fproduction%2F769a196bf516d6e5aa3e4dbd0b9430bf50d83cb2-700x450.jpg%3Fh%3D450%26w%3D700&w=1920&q=100)
![image alt text](/_next/image?url=https%3A%2F%2Fcdn.sanity.io%2Fimages%2Fncnlaurs%2Fproduction%2Fd60ea07601e6f0ec93219dd456786e65b9da04ba-700x450.jpg%3Fh%3D100%26w%3D210&w=640&q=100)